Persona thread — auto-compiled into the design pack
Design Engineering
Package spec rev D frozen; 8-layer ABF substrate confirmed.
Program Management
Tape-out gate locked; sourcing must close 6 weeks prior.
Quality
JEDEC qual matrix required with three lots before ramp.
Procurement
Dual-source mandate for substrate and assembly.
Initiated programs
NPI-8412
Teralynx 10 Switch Silicon
Data Center Networking · $14.2M
NPI-8390
Bravera SSD Controller Gen6
Storage · $6.4M
NPI-8377
Alaska A 800G PHY
Automotive & Optical · $9.8M
NPI-8355
OCTEON 12 DPU Board
Carrier Infrastructure · $11.8M
NPI-1483
Prestera CX 9000 Series
Data Center Networking · $50,000
NPI-2041
Teralynx 12 800G Switch ASIC
Data Center · $18.4M
NPI-2042
Bravera SC5 SSD Controller
Storage · $9.2M
NPI-2043
Alaska A 1.6T PHY
Networking · $7.6M
NPI-2044
Prestera CX 5nm Fabric
Carrier · $22.5M
NPI-2027-02
OCTEON 11 DPU
Data Processing Units · $0
NPI-2027-03
Alaska C 900X PHY / DSP
Optical DSPs / PHYs · $2.0M
NPI-2027-04
Bravera SC60 Controller
Storage · $0