Procurement Dashboard

Unified visibility across every Marvell NPI sourcing program — health, gaps, quotes and system sync.

Showing 12 of 12 programs

Active NPI programs

12

Open high-severity gaps

4

RFQs in flight

14

Sync exceptions

6

NPI status

12 programs by delivery status · click a segment for details

Design pack status

Completeness of required NPI documentation

RFQ status

14 RFQs by stage · click a segment for details

Project details

NPI IDProgramOwnerStatusDesign packRFQ
NPI-8412Teralynx 10 Switch SiliconA. Raghavan
On Track
100%
5 open / 5 total
NPI-8390Bravera SSD Controller Gen6M. Chen
At Risk
100%
1 open / 1 total
NPI-8377Alaska A 800G PHYS. Fernandes
On Track
100%
1 open / 1 total
NPI-8355OCTEON 12 DPU BoardL. Moreau
Watch
100%
1 open / 1 total
NPI-1483Prestera CX 9000 SeriesProcurement Analyst
On Track
0%
NPI-2041Teralynx 12 800G Switch ASICA. Rodrigues
On Track
100%
2 open / 2 total
NPI-2042Bravera SC5 SSD ControllerM. Chen
At Risk
100%
1 open / 1 total
NPI-2043Alaska A 1.6T PHYS. Iyer
On Track
0%
1 open / 1 total
NPI-2044Prestera CX 5nm FabricL. Okafor
Watch
0%
2 open / 2 total
NPI-2027-02OCTEON 11 DPU
On Track
0%
NPI-2027-03Alaska C 900X PHY / DSPDan Jones
On Track
0%
NPI-2027-04Bravera SC60 Controller
On Track
0%

Missing design pack documents

Programs blocked from supplier selection, with the document owner to chase.

NPI-1483

Prestera CX 9000 Series

6 missing · 0% complete

NPI-2043

Alaska A 1.6T PHY

6 missing · 0% complete

NPI-2044

Prestera CX 5nm Fabric

6 missing · 0% complete

NPI-2027-02

OCTEON 11 DPU

6 missing · 0% complete

NPI-2027-03

Alaska C 900X PHY / DSP

6 missing · 0% complete

NPI-2027-04

Bravera SC60 Controller

6 missing · 0% complete

Active programs

NPI-8412

Teralynx 10 Switch Silicon

Data Center Networking · A. Raghavan · tape-out 2026-11-15

RFQ Dispatch

$14.2M

51.2T switch ASIC NPI covering substrate, OSAT and test hardware sourcing.

Program health · On Track88%

NPI-8390

Bravera SSD Controller Gen6

Storage · M. Chen · tape-out 2026-09-30

Supplier Selection

$6.4M

PCIe Gen6 controller ramp; substrate lead times pressuring the sourcing window.

Program health · At Risk62%

NPI-8377

Alaska A 800G PHY

Automotive & Optical · S. Fernandes · tape-out 2027-01-20

Smart Audit

$9.8M

800G PHY optical module NPI with dual-source packaging strategy.

Program health · On Track91%

NPI-8355

OCTEON 12 DPU Board

Carrier Infrastructure · L. Moreau · tape-out 2026-12-05

Supplier Collaboration

$11.8M

DPU reference board build; PCB and connector sourcing under negotiation.

Program health · Watch74%

NPI-1483

Prestera CX 9000 Series

Data Center Networking · Procurement Analyst · tape-out 2027-02-02

Initiate

$50,000

The Prestera CX 9000 series is Marvell's next-generation 51.2 Tbps Ethernet switch architecture designed for hyperscale cloud data centers and dense AI interconnects. Leveraging a 5nm process node, the CX 9000 minimizes power consumption while maintaining ultra-low latency packet processing.

Program health · On Track75%

NPI-2041

Teralynx 12 800G Switch ASIC

Data Center · A. Rodrigues · tape-out 2026-11-15

Source Data Hub

$18.4M

800G Ethernet switch silicon NPI; substrate and OSAT sourcing in progress.

Program health · On Track88%

NPI-2042

Bravera SC5 SSD Controller

Storage · M. Chen · tape-out 2026-09-30

Smart Audit

$9.2M

PCIe Gen6 SSD controller; BOM gaps flagged on NAND interface components.

Program health · At Risk61%

NPI-2043

Alaska A 1.6T PHY

Networking · S. Iyer · tape-out 2027-01-20

Supplier Selection

$7.6M

1.6T PAM4 PHY NPI; shortlisting APAC OSAT partners.

Program health · On Track79%

NPI-2044

Prestera CX 5nm Fabric

Carrier · L. Okafor · tape-out 2026-12-05

RFQ Dispatch

$22.5M

5nm fabric switch; RFQs out to three substrate vendors.

Program health · Watch72%

NPI-2027-02

OCTEON 11 DPU

Data Processing Units · · tape-out TBD

Initiate

$0

Sourcing scope for the OCTEON 11 DPU utilizing a cutting-edge 3nm process with up to 128 ARM Neoverse V2 cores. Sourcing must secure advanced wafer foundry capacity, high-layer ABF substrates, and OSAT assembly for PCIe Gen6 and 12-channel DDR5 integration. Procurement strategy aligns to meet the target launch in Q3 2027.

Program health · On Track75%

NPI-2027-03

Alaska C 900X PHY / DSP

Optical DSPs / PHYs · Dan Jones · tape-out TBD

Initiate

$2.0M

This NPI sourcing request covers the Alaska C 900X, a 3nm TSMC PAM4 DSP targeting 1.6T optical transceivers and active electrical cables. Key sourcing requirements include securing 3nm wafer foundry capacity, high-performance packaging substrates, and OSAT assembly/test services for high-frequency 212 Gbps per lane operation. Sourcing milestones must align to support the target launch in Q1 2027.

Program health · On Track75%

NPI-2027-04

Bravera SC60 Controller

Storage · · tape-out 2026-10-31

Initiate

$0

Sourcing scope for the Bravera SC60, Marvell's PCIe Gen6 NVMe SSD controller designed for cloud and enterprise storage. Sourcing requirements include wafer foundry fabrication, ABF substrates, and OSAT assembly/test services. Launch is targeted for Q4 2027.

Program health · On Track75%

AI alerts

Compliance

Export-control classification pending for China-based OSAT.

Risk

Substrate second source not documented; single-source risk.

Compliance

No signed NDA on file for two shortlisted substrate vendors.

Risk

18 long-lead BOM items lack a qualified second source.

Run a smart audit